Your account

All stories
HOL-D063Story implementation: Ready to review

Make the demo available for team review

September 30, 2026

Demo improvement · Across launch phases · Completed work and checks

Historical work completed by 2026-09-30; recorded retrospectively on October 15, 2026. This record does not represent newly completed work in the current week or stakeholder approval.

The initial Andy-controlled staging release and its delivery checks are complete. This is not the later HOL-owned hosting setup or a production-ready member service.

Implementation status is separate from stakeholder approval and publication.

Goal

As an HOL reviewer, I want a shared web address for the prototype so I can review it without running a local development environment.

How to check

  1. Read the dated September30 deployment and verification record below.
  2. This is a technical delivery review; no member click-through proves the historical deployment.
  3. Treat the current staging site as a later build at the same review location; the recorded version identifies the historical release.

Historical completion criteria

  • Provide a stable publicly reachable staging address limited to the Backcountry application route.
  • Package the prototype images and verify the delivered image payloads.
  • Verify Home, Roadmap and connected workflow review states, including phone layout.
  • Preserve the existing portfolio/mail environment and keep real authentication, member data, email and payments disconnected.

Recorded results · 1 item

Historical changes and the verification recorded at the time. Links to current references may include later revisions.

  1. Completed:

    Publish and verify the initial shared review build

    technical review
    Where:
    Andy-controlled Backcountry staging
    What changed:
    Published the scoped staging Worker, corrected base-path image delivery and checked the shared review screens on phones.
    Expected result / How to check:
    Read the dated release record and its recorded checks rather than attempting private hosting operations.

    Evidence: September30 release version5d165aa0-9185-4ac3-bcbc-f693b2d279ef; log records live page/image verification and390px Home/Roadmap/workflow checks. No live backend was connected.

    Historical work completed by October 7, 2026; recorded retrospectively on October 15. Current screens may include later revisions.